タイトル
  • ja 降雨予測リードタイムの延長による多目的ダムの弾力的管理の向上
その他のタイトル
  • RESEARCH ON IMPROVEMENT OF FLEXIBLE DAM OPERATION BASED ON EXTENDED FORECAST RAINFALL
作成者

林下, 直樹

中津川, 誠

臼谷, 友秀

権利情報
    • © copyright 2014 土木学会
主題
  • Other 多目的ダム
  • Other ダムの弾力的管理
  • Other 降雨予測
  • Other 積算予測雨量
  • Other multi-purpose dam
  • Other flexible dam operation
  • Other rainfall forecast
  • Other cumulative forecasted rainfall
  • NDC 517
内容注記
Other
  • This study investigates small-scale hydropower generation utilizing the dam water currently released solely for maintaining the river discharge. Toward improving such small-scale hydropower generation, a method for flexible operation of dams is proposed. In flexible operation, a portion of the flood control capacity is allocated to water storage. When a flood is forecasted, it is necessary to release that amount of water to recover the dam's flood control capacity. In conducting such release, accurate forecasting with sufficient lead time is desirable. This study examined the possibility of determining the necessity of water release ahead of forecasted rainfall by estimating the amount of water flowing into the dam reservoir based on forecasted cumulative rainfall computed from numerical weather prediction models (RSM and GSM).The examinations clarified that by employing the proposed method it would be possible to secure water which is about 8 times that currently used for power generation.
出版者土木学会
日付 Created 2019-03-12 , Issued 2014
言語jpn
資源タイプjournal article
出版タイプVoR
資源識別子 URI http://hdl.handle.net/10258/00009747
関連
  • isIdenticalTo DOI https://doi.org/10.2208/jscejhe.70.I_1471
  • isIdenticalTo NAID 130005070088
  • isVersionOf URI https://www.jstage.jst.go.jp/article/jscejhe/70/4/70_246/_pdf/-char/ja
収録誌情報
    • NCID AA12373113
    • ISSN 2185-467X
    • 土木学会論文集B1(水工学) = Journal of Japan Society of Civil Engineers, Ser. B1 (Hydraulic Engineering)
    70(4), I_1471-I_1476
ファイル
コンテンツ更新日時2019-07-29T03:42:32Z